Don’t worry we won’t send you spam or share your email address with anyone.It will play an important role in the UK’s hazard reduction programme and is testament to the collaboration between Sellafield Ltd and our supply chain partners, Balfour Beatty and Cavendish Nuclear.Congratulations to all those who have played their part and those who will safely operate the plant as it makes Sellafield safer, sooner.To mark their impressive safety record, the team has donated £8000 to eight local charities, chosen by those who have worked on the project.The Silos Maintenance Facility will house and maintain the machinery that will get the waste out of two of the oldest plants on the site.It has taken nine years to build and is described as the site’s ‘Formula One pit lane’, a place where the machinery doing the most important job in UK nuclear decommissioning can be maintained in a safe, secure environment.The nuclear site is moving into a 100 year programme of environmental remediation, which means speeding up the decommissioning of old facilities and moving the waste into safe containment for centuries to come. The new mechanical handling plant will support two existing waste silos with retrieving historic waste and reducing hazard.  At the heart of the heavily reinforced concrete structure, which has a footprint of 0.5 hectares and will be 25 metres high, robotic installations will enable the Sellafield team to operate in a safe and controlled environment.Balfour Beatty is currently delivering a £17m contract for the provision of electrical, control and instrumentation for the URENCO uranium enrichment management facility in the Wirral.  Balfour Beatty  is also one of two contractors delivering the £288m framework for construction, infrastructure and maintenance projects across all 10 nuclear sites operated by nuclear management and operations contractor Magnox . Balfour Beatty's Southeast team educates DBEs on how to successfully bid, win and execute work with US Department of Transportation. Registered No: 395826; Registered Office: 5 Churchill Place, Canary Wharf, London E14 5HU Balfour Beatty UK construction chief executive officer Nicholas Pollard said: “Balfour Beatty has a strong heritage in the nuclear sector including a 35 year presence at Sellafield. Warrington, United Kingdom. Formed in 2012, the Balfour Beatty Bailey joint venture brings together two of the leading specialists in nuclear new build – Balfour Beatty Engineering and NG Bailey – offering customers an unrivalled blend of sector skills and expertise. This website is only for private investors. Queries about the content of an announcement should be directed to the source.

The Mustard Seed Consignment, Lil Kim Twitter, Courtney Stodden Chris Sheng, Destroyer Have We Met (Vinyl), Hailey Clauson Wild 'n Out, On Sight Meaning, Jaeden Martell Twitter, This Nintendo Network Id Has Already Been Linked Wii U,

balfour beatty sellafield